Southern California Construction Plan Cost Calculator
Example construction plan estimate
What the calculator showed on November 17, 2026 for a detached ADU in the City of San Diego. Enter the same answers above to see today’s range.
- Project type
- A backyard unit (detached ADU)
- Jurisdiction
- City of San Diego
- Square footage
- 800 sq ft of new space
- Estimated plan fees
- $6,500–$13,500 (typical $10,477)
- Design and engineering
- about 80–125 hours of design and engineering
- Based on
- Our latest 82 new-building projects, priced from the 11 closest matches
What we include
- Design drawings and build-ready construction documents
- Structural plans and calculations stamped by a California-licensed engineer
- Title 24 energy compliance
- Plumbing fixture, electrical panel, and equipment locations on the plans (full MEP design is separate)
- A set put together for submittal to your jurisdiction
- Responding to the city’s plan-check comments on our drawings, and resubmitting
What the owner budgets separately
- Construction
- City plan-check and permit fees, and permit processing
- Full mechanical, electrical, and plumbing (MEP) design, contracted separately when your project needs it (ask us)
- Grading, drainage, and retaining walls (ask us)
- Surveys and soils reports
- HOA approval (the owner’s responsibility)
Construction plan costs, answered
How much do construction plans cost in Southern California?
For the residential projects our team works on, design drawings, structural engineering, and Title 24 together usually come to $6,500 to about $25,000, depending on the project. New homes over 2,500 sq ft are priced by size, so a larger home costs more. Structural engineering alone, for drawings by your own designer, starts at $2,500. Here is what the calculator showed on November 17, 2026 for projects in the City of San Diego:
| Project | Size | Estimated plan fees |
|---|---|---|
| Garage conversion | 400 sq ft | $5,765–$9,000 |
| Unit inside the house (JADU) | 500 sq ft | $6,500–$9,500 |
| Remodel that removes walls | 1,500 sq ft house | $6,500–$9,000 |
| Room addition | 400 sq ft on a 1,500 sq ft house | $6,500–$12,500 |
| Detached ADU | 800 sq ft | $6,500–$13,500 |
| Attached ADU | 600 sq ft | $6,500–$17,000 |
| New home | 2,500 sq ft | $10,500–$24,500 |
| New home (priced by size) | 4,000 sq ft | $18,000–$32,000 |
Construction, city fees, and outside consultants are separate. Your own range depends on your project, your lot, and your city.
What does the estimate include?
One coordinated set from one team: design drawings and construction documents, structural plans and calculations stamped by a California-licensed engineer, and Title 24 energy compliance, put together for submittal to your jurisdiction. Cities send plan-check comments on nearly every set; responding to the comments on our drawings and resubmitting is included. Plumbing fixtures, the electrical panel, and equipment are located on the plans; full MEP design is a separate contract when a project needs it.
Not included: construction, city plan-check and permit fees, permit processing, surveys, soils reports, grading, drainage, retaining walls, and HOA approval (the owner’s responsibility). We never promise permit approval or timing; cities set their own reviews.
What changes the cost of design drawings and structural engineering?
- Size and scope
- More new or converted space, a second story, or several projects at once (an ADU plus an addition, for example) means more drawings and more engineering.
- Structural changes
- Removing walls, adding a story, long beams, and new foundations take more engineering than an interior layout change.
- Your existing house
- Remodels, additions, and conversions start with measuring and drawing what's there. Older or altered houses take longer.
- Your lot and jurisdiction
- Hillside, coastal, historic, and fire-hazard areas can add design work, reports, and review steps. Each city has its own requirements.
- Design changes
- Changes after you approve the schematic design are additional services, because they ripple through the design, structural, and Title 24 work.
- Outside consultants
- Surveys, soils reports, grading and drainage, and full MEP design are separate when your project or your city needs them.
Ready for a reviewed quote?
Run the calculator above, then request a reviewed plan quote. We look over your project and confirm the scope and the fee, usually within 2 business days. Have plans or photos already? Upload them here.